PRODUCT DESCRIPTION
DR Digital Radiography System NDT Inspection Ceramic X Ray Generator Industry Equipment RD-3505
Main introduction:
RD-3505 is an industrial X-ray flaw detector with small size, light weight, compact size, easy to carry, strong penetration, time-saving and labor-saving, strong stability, low failure rate, continuous exposure for 15 minutes, no need for 1:1 rest, suitable for chemical spherical tanks, large diameter pipeline double wall single shadow filming, improve work efficiency by 50%. The equipment is easy to carry, the generator weighs only 34kg, and the design is exquisite. This series of equipment is divided into directional and circumferential, and the maximum penetration of Q235 steel thickness is 55mm.
RD-3505 the technical parameters
|
Project |
RD-3505 |
input |
Input power |
Single-phase AC150-250V 50/60Hz |
Power supply capacity |
No less than 3.0 KVA |
|
output |
X - ray tube voltage |
170~ 350 KVp |
X ray tube current |
5mA |
|
mA Stability degree |
± 1% |
|
Ray tube |
Focal size |
2.5× 2.5 |
X-ray irradiation range |
40±5° |
|
Ray generator |
working pressure Cooling mode Insulation way |
0.35MPa ~ 0.5Mpa Anode ground connection radiator Strong wind cold Gas insulation SF6 |
Size weight (kg) |
φ320×640 |
|
34 |
||
Maximum penetration |
Thickness steel A3(mm) |
55 mmFe(5 min) |
condition |
focal distance 600mm ,Agfa film,Double lead foil,Liquid temperature 22,Film density ≥1.5 |
|
|
sensitivity |
superior 2% |
controller |
Size weight Circuit |
325×270×180 < 9(kg) Automatic control and protection |
Environment |
working temperature relative humidity Altitude |
-30°~ +40° Not more than 85% Not higher 1500m |
methods |
fully automatic 4:1 Work and rest,Longest continuous exposure time 15mins |
FAQ
Q1. Are you a factory or a trading company?
We are a factory with 50 years of experience.
Q2. What's the MOQ ?
(1). Normally, MOQ is 1 piece. The quantity is depending on the clients’ needs.
(2)According to customer order, the quantity still can be negotiated and we will product immeditaly if we dont have stock.
Q3. What is your principle for the samples ?
No free samples. But we provide 1piece as a sample order for all items.
Q4.Which payment can be acceptable ?
We could accept the payment by T/T, Paypal, Western Union,L/C, etc.
Q5. How about the lead time?
If no stocks, it takes 7 to 15 working days to manufacture after receiving the advance payment.
If in stock, 2-4 working days are possible. But it depends on the exact products and quantity.